Buyers these days have a number of options open to them when purchasing certain developments. It used to be the case that, in most cases, a buyer could purchase a plot, or a plot-and-plan. A few years ago, with the reduced funding appetite from the banks, developers introduced a Turnkey sale which the banks were very receptive to.
However, there are some fundamental differences between a Turnkey and a Plot-and-Plan sale, which need to be understood.
“Plots and Pans” by Kelly Eileen Hake is a book that was an emotional roller coaster for too many times I cried broken up with laughing out loud. Because I always rate higher when I believe that a book rate a. A site plan is a readable map or a residential diagram depicting the plot of land on which the house sits, along with landscape topography and any exterior features or structures such as a detached garage, in. Creating a year-round food plot plan. Picture the sceneyou’re gathered around the dining table with family and friends for a lavish holiday meal. There’s a table full of all your favorites.
The conventional plot-and-plan sale meant that a buyer would purchase a plot, have plans drawn up and a building quote, and submit to the bank for finance. Once finance is approved the buyer takes transfer of the plot, and enters into a building contract with a builder.
Box and Whisker Plot Lesson Plan. In this lesson, students will explore the reasoning and method. Plot plans provide valuable information, including the physical boundaries of the parcel and the locations of structures, fences and driveways.
As the building progresses the builder is paid out in stages, or draws, either by the buyer or the bank, until the property is completed.
The benefits of such a purchase are that the buyer can build the house he wants according to his budget, with the finishes he desires.
The negative is that the buyer has to carry to cost of servicing his bond while the property is under construction, which could be anything between 4 and 12 months. In addition to this, the buyer has to deal directly with the builder, handle the payments, deal with issues, and carry the risk of delivery – in other words, it’s up to the buyer to manage the whole process.
A few years ago the banks took a conservative approach to plot-and-plan finance applications, mainly because of the delivery risk, and in many cases only offered finance up to 80% of the total building and land cost.
In order to appeal to buyers who required a higher loan-to-value bond, and who wanted to avoid the stress of building, some developers, on the advice of Harcourts Platinum, introduced a Turnkey product.
The Turnkey product consists of a range of pre-designed homes with plans already approved by the municipality. The buyer selects the property he wants and signs a contract to purchase a completed home where he has a choice of finishes from the range provided, but where no changes to the plans can be entertained.
The benefits of a Turnkey product are that the developer funds the entire building process, deals with all building issues, and delivers a completed product to the purchaser. The buyer only pays for the property once it’s completed, thus removing any delivery risk for the purchaser.
This has proved an extremely popular option to many buyers in developments marketed by Harcourts Platinum. The main difference is that buyers cannot change the pre-approved plans, and need to restrict their finishes to the range the developer offers. However, the benefits of not having to fund the construction or deal with building issues means that a buyer gets a brand new home, with the finishes he wants, without any of the stress associated with building.
Banks are generally happy to finance a turnkey home to the same extent they would finance a second hand home – so buyers benefit from higher loan-to-value rates, although banks have warmed up to plot-and-plan bonds again. Both products have their advantages – be sure you understand exactly what you are purchasing.
Steve Caradoc-Davies
Principal of Harcourts Platinum, and Director of Harcourts South Africa
Email your real estate question to steve.cd@harcourts.co.za.
The majority of Process Plants require a plot plan with somewhat less stringent and less complicated arrangements than a refinery. Equipment spacing requirements will vary with the type of plant and location. Plot plans are considered key documents to projects and are normally initiated in the pre-contract, conceptual and development stages of a proposal. After the contract is awarded for engineering, plot plans are developed at a rather rapid pace with very limited information. This early stage plot plan usually is very limited in detail, containing only enough dimensional data to define the outer limits of the available property selected for plant development. Located within the boundaries of the available property, rough equipment sizes and shapes are pictorially positioned, along with anticipated pipe rack configurations, structure shape and rough sizes. The plot plan at this level of detail is then used for constructability evaluation and is normally submitted to the client for approval.
The piping engineer has to understand the concept of equipment layout and consideration. While preparing layout, the piping engineer should design a steady process, non-hazardous utility and facility. In general the various process plants we come across are petroleum refineries, petrochemical complexes, fertilizer plants, and chemical and pharmaceutical plants which need special attention due to the nature of materials and products handled.
Before starting the development of the plant layout, the following information is required.
- Process units and capacities.
- A flow diagram indicating the process flow sequence.
- Utility requirement.
- Number of storage tanks and also open storage areas.
- Raw material / product receipt and dispatch philosophy.
- Covered storage required.
- Number of flares (As applicable).
- Grouping philosophy for utilities.
- Non-plant building i.e. Administrative block, laboratory, security workshop, parking space, fire station, canteen, etc.
Ideally, before site selection, a preliminary layout should be made. The data collected during the site selection stage shall be given due consideration at the time of the equipment layout. A few points to be considered are:
- Site location, map and area topography, geological and meteorological data.
- Environment condition relative to adjacent properties: proximity to railway, road, airport.
- Soil conditions, prevailing wind direction.
- Source of water supply and the supply point with respect to the plot.
- Electric supply point with respect to the plot.
- Effluent disposal point and other drainages.
- Material transportation-railway entry point approach roads barge or ship dock etc.
- Geographical factors: wind direction, temperature, rain, frequent thunderstorm and earthquake susceptible areas.
Major Consideration in Plant Layout: The most economical plant layout is that in which the spacing of the main equipment is such that it minimizes interconnecting pipe work and structural steel work. Normally equipment should be laid out in sequence to suit the process flow but exception to this arises from the desirability to group certain tanks, pumps or perhaps to isolate hazardous operations according to statutory rules and regulations. The use of the single stream or multiple stream flow pattern will affect the layout.
The major variables affecting the final layout are interconnected pipe sizes, insulation thickness, steel work spacing, matters of operational convenience, safety, ease of erection and maintenance which calls for critical judgment on the experience and the study of existing and known limitation.
Economic: Basically economic consideration means installing the unit in the smallest possible space, consistent with the operability ease of piping material, structural sheets and concrete with the proper layout considering further economies which can be achieved in way of pumping and utilities.
Safety: Where toxic or hazardous materials are handled, layout may be needed to isolate a section of the plan equipment, which could be a possible source of hazard. It should be grouped together and where possible located separately from other areas of the plant. i.e. furnaces, flare stacks or other equipment containing naked flares. Mechanical equipment handling flammable or volatile liquids which could easily leak or spill out of the equipment thus causing flammable conditions. However such consideration should not override considerations of cost. For instance, the process heater must necessarily be located close to other equipment to conserve expensive alloy piping. Furnaces using gas as a feedstock do not normally constitute hazards. Due consideration shall be given for fire hazardous areas and isolated by providing firewall, fire door, etc. The BOCA (Building official and code administration) published by the National Building Code shall be followed. The equipment area handling acids or other toxic material, which cause damage or endanger personnel by their spillage should in general be grouped together and isolated. To isolate hazardous areas it may be necessary to build walls with self-closing doors.
Process: Process considerations may require some items be elevated to provide gravity flow of materials to accommodate pump suction requirement for NPSH. The other process consideration could be the limitation of pressure or temperature drop in the transfer lines deciding the proximity of the furnace, reactors and columns.
Operational: Thought should be given to the location of equipment requiring frequent attendance by operation personnel and the relative position of the control room to obtain the shortest and most direct route for operator. When on routine operation however the control room should be placed so that they are easily accessible and the indicators are easily readable. Generally a batch or semi batch process needs more attention by the operator and therefore more consideration has to be paid to the ergonomics of the layout.
Maintenance: The need to remove for servicing, retuning or replacements, the heavy, servicing equipment. The indivisible plant will dictate their location when access for cranes is called for regular or rotating and other machinery calling for dismantling. This often makes their grouping within the machine house desirable. The position of items needing replacement of internal spent catalyst etc. or frequent internal cleaning has to be carefully considered.
Constructional: The plot should be so designed that adequate access is available to lift the large items of equipment or columns into place. Such equipment is positioned close to the boundary limits so that erection must take place from outside these limits. A careful check must be undertaken to ascertain whether space will be available at the time of erection for positioning the crane or lifting the delivery equipment which is known, may well arrive fairly late in the construction program and therefore have to be fitted into place after most of the surrounding equipment has already been installed. It is important that the insulation requirement be considered during the layout of the plant.
Appearance / Aesthetic: An attractively laid out plant with the equipment in rows also economically laid out gives an aesthetic appearance. The building structure and groups of equipment should form a neat, symmetrical balanced layout consistent with keeping the pipe run to a minimum and allowing proper access for maintenance. The tower and large vertical vessels should be arranged in rows with a common centreline. They should be of similar size but if the diameter varies, due note must be taken of the building line manholes on the adjacent tower should be at a similar elevation and orientation to streams. These as far as possible should be made identical. Such arrangement for parallel streams or similar groups of process equipment require much the design work and also for construction and subsequently operation but help in reducing the amount of standby equipment.
Future Expansion: Thought should be given to the likely expansion of both equipment and pipe work, so that additions can be erected and tested with the minimum interference to plant operations. On main pipe runs, it is desirable to leave 30% space. At least 30 m distance from flame proof plant area is needed for safe welding where no special precaution are needed.
Buildings: Plant buildings should be kept to a minimum on the basis that most of equipment including pumps, heat exchanger boilers, cyclones, etc. may be safely installed in the open. The philosophy should be that the plant is supported on an open steel structure unless there is good reason not to do so. Thus it is to be installed in the open with centralized control facilities housed in buildings.
Factors which determine the selection of enclosed buildings are - Nature and frequency of the operator's work- Equipment, which requires frequent maintenance in adverse weather conditions.
- Climate- Extreme climate conditions may determine that the plant is to be kept in a building.
- Type of equipment - Expensive equipment and complex machinery should have some degree of weatherproofing.
- Nature of process - Plants handling dust explosive and combustible solid materials require a building .To prevent contamination, food, pharmaceutical and bio-chemical plants require to be in a building.
- Proximity of hazards- To prevent the possible spread of fire and explosion, a building may be desirable.
If enclosed buildings are planned, then consideration must be given to the following factors - Fire protection / Explosion Protection approval by the local fire authority must be obtained on fire fighting equipment and layout.
- Illumination: Natural illumination may be obtained by the use of patent glazing windows or translucent sheets in the sidewalls or the roof. Artificial lighting must be arranged to give adequate illumination where physical and chemical hazard exists
- Fireproofing: Determines the plant arrangement and switch room.
- Heating / Ventilation: Air intake should be positioned in such a way that it should avoid the risk of drawing toxic or hazardous fumes. Exhaust may be required for treatment of filter washer, separation.
- Access: Proper access for maintenance and operation purposes to be considered.
- Roofing.
Techniques for Layout: There is no single technique leading to the best arrangement in any problem. Layout may be considered at several stages from the selection of the site and arrangement of the plant on it through block layout.
The three basic principles of layout planning are: - Plan the whole, then the detail, Individual aspects must be subservient to the whole and sub optimisation avoided.
- Plan the ideal, then the practical. The ideal layout is free from restrictions and gives a datum.
- Plan more than one layout. It is seldom that a single layout is 'BEST' for each criterion. Planning more than one permits comparison and leads to greater confidence in making the final selection.
- Sequence of activities in layout. A simplified network showing the integration of the plant layout and design activities should be given.
Layout Analysis Methods:
1) Cut out to visualise plant layout: 2 dimensional scale templates or scale cutouts of unit areas and equipment layout are prepared.
2) Block models: These models are chiefly used to develop the plot plan, floor plan, elevation, major equipment and major pipe racks in the correct co-relation with each other.
3) Drawings: For the development and evaluation of the layout it co- relates the basic project information on the equipment and site condition and provides source of data for the final layout.
4) Piping models: For accurate detailed layout of the process piping utility and control facilities.
Concept of the Plant Layout: A process plant which consists of the various different sections mentioned earlier should be arranged so as to follow the general route of the raw material, to process, to intermediate/finished product stage to dispatch. The entire plot area will be divided into blocks, the size of the blocks depend on the facilities to be accommodated. While locating the blocks and further sub-blocks within them, the following points runs should also be minimum.
1) The layout planning shall be in the sequential order of the process flow so that the piping run is also minimum.
2) The block shall be arranged considering the prevalent wind direction such that flammable gases should not be carried by the wind onto a source of ignition.
3) The process unit block shall be centrally located with a straight approach from the main gate.
4) Storage tanks shall be grouped according to product classification. In undulating areas, storage tanks shall be located at lower elevations.
5) Utility blocks shall be located adjacent to the unit block.
6) The main power receiving station shall be close to the boundary line so that the minimum overhead power lines pass through the plant.
7) The electric sub- stations in the plant shall be located in such a way that cabling to major load centres are minimum.
8) The location of power plants shall be near the process/utility block and close to the main receiving station.
9) Flares shall be located upwind of the process units so that the inflammable gas from the plant are not carried towards the flares.
10) Truck loading facilities shall be located close to the product movement gate. Rail loading facilities are arranged generally at the periphery of the plant.
Plots And Plans Kettering
11) The effluent plant shall be located away from the other units on the down elevation. The preferred location is at the lower elevation than the other plant units in order to facilitate gravity flow.
12) The fire station and firewater pump house shall be at a safe place away from hazardous areas. The fire station shall be near the main gate with a straight approach to the process units and other critical areas.
13) Two adjacent process unit locations shall be decided based on the annual shut down philosophy for the maintenance of the units. If the shut downs are be at different times, it is preferable to increase the distance between the two units so that the risk for the operating units due to heat jobs in the units under shut down can be minimised. Also this will facilitate easy maintenance.
14) Process Units shall be located on the high ground.
15) The adjacent neighbourhood installations, if any, shall be taken into consideration before fixing the plant layout. The limitations imposed by the neighbourhood facilities cannot be ignored, e.g. an ignition source.
16) Flares, furnaces/heater, dusty operations and cooling towers shall be oriented depending on the prevailing wind direction. The first two shall be located upwind of the Process units and the last two on the downwind directions of the process units.
17) Due consideration to the construction and erection of the plant shall be given while deciding the plant layout, especially tall towers, reactors, furnaces, etc. shall not be in congested areas and sufficient open spaces shall be provided for erection at any stage.
18) Equipment requiring frequent maintenance shall have easy accessibility. So also equipment which need removal of parts and also for free access for hoisting equipment.
19) Provisions for future expansion shall be considered. It is preferable to have similar type of facilities with adjacent space for expansion adjacent. Care shall be taken to install the expansion facilities without any disturbance to the existing facility.
20) Roads in between for the purpose of access and safety should separate the blocks developed. Fire fighting facilities are to be provided on these roads. There shall always be an alternative approach for fire fighting and maintenance in case one route is blocked. The layout shall be so designed that truck traffic inside the plant is minimized.
21) Boiler house, air compressors, fuel oil facilities shall be grouped into one block adjoining the process unit blocks, so that spreading of various utilities can be avoided and also facilitate easy operation.
22) The layout shall be designed so as to minimise the capital cost for earthwork and pavement, special foundations and the extent of a vacant plot as wasteland.
Plots And Plan Definition
Equipment Location DrawingAubrey Woods Plums Plots And Plans
: Equipment location drawings (plot plans) show the exact location of equipment in relation to the plant’s physical boundaries. One of the most difficult concepts to explain to a new process technician is the scope and size of modern chemical processing. Most chemical plants and refineries closely resemble small cities; they have well-defined blocks and areas connected by a highway of piping and equipment. Equipment location drawings provide information about the neighborhood.
Plots And Plan